You are here: PROJECT PORTFOLIO > RESIDENTIAL DESIGN PROJECTS > COMMERCIAL

Commercial   

Office 

Corporate Dental Office

Master Plan Scheme 1  - Building I (1 story) 8,864 sq. ft.

                                           - Building II (2 story) 18,764 sq. ft.

Master Plan Scheme 2  - Building I (1 story) 8,893 sq. ft.

                                           - Building II (2 story) 18,848 sq. ft.

Master Plan Scheme 3  - Building I (1 story) 10,212 sq. ft.

                                           - Building II (2 story) 20,990 sq. ft.

Master Plan Scheme 3.1 - Building I (1 story) 10,212 sq. ft.

                                             - Building II (2 story) 22,866 sq. ft.

 

Hanbury Dental Office     

Floor Plan - 2,415 sq. ft.

 

VDOT Seaford

Floor Plan  North Elevation  South Elevation

 

Oak Grove Commerce Center

Site Plan Scheme 1  Site Plan Scheme 2  Site Plan Scheme 3

 

Retail

Golden Touch Massage & Spa 

Floor Plan - 1,650 sq. ft.

 

Nail & Tan

Floor Plan - 1,937 sq. ft

 

 

Religious

Tabernacle Baptist Church

1st Floor, College Offices & Sanctuary Plan

2nd Floor, Balcony & Attic Plan

3rd Floor Sanctuary Plan

 

St. Luke AME Church

New Work Plan

 

OHEF Shalom Temple

East Elevation  South Elevation  First Floor Plan  Second Floor Plan

 

 

Hotels

Proposal

Hotel Atlantis - Eleuthera, Bahamas

A total of 1,175 Acres inclusive of onshore land and offshore water.  The Master Plan consist of ocean activities, land activities with hotel, bridges (pedestrian and vehicle), glass tunnel, monorail, heliport, docking area for cruise liners, parking, golf course, equestrian activities, tennis courts, volleyball courts, swimming pool, water sports, floating restaurants, bicycle paths, cottages, water bungaloos, multi-purpose room, dining rooms, welcome center, gazebos, diving, snorkeling, coral reefs and open areas.

The hotel has 1,407,016 Square Feet with 660 studios, (12) one bedroom suite, (2) two bedroom suite and is 13 stories above water and 13 stories below water, made completely of triple glazed glass to withstand hurricanes up to 250 mph wind and laminated Plexiglas, 8 inches minimum to 22 inches maximum to withstand the water pressure.

The hotel consist of a main lobby at the entrance/ bridge level, 26 story atrium, central lobby on each floor with glass elevators and open stairs, enclosed stairs and elevators for service and fire exits, support spaces, dining rooms, casinos, theater, entertainment, aerobic/gym, kitchen, laundry, mechanical/ electrical/ telephone rooms etc.

The hotel will run on solar energy (photovoltaic panels) with generators, desalinization plant to turn salt water into potable water, sewage system will meet EPA requirements.

 

Front Elevation

 

Rear Elevation

Master Plan

Cross Section

Entry Level Floor Plan

Level 13 and Top View

 

Level -11 and Level -12

 

Proposal

Hotel Machu Pichu, Cuzco, Peru

Site Plan

Elevation

Right Elevation

 

 

Proposal

Hotel Waterbury, CT

 

Front Elevation

 

Skyscrapers

Proposal

World Trade Center - New York City

Scheme 1

 

Scheme 2

Scheme 3

 




 

Guilbaud Enterprises

924 Professional Place, Suite A
Chesapeake, VA 23320

Office (757) 410-2940
Fax (757) 410-2074

 




All website content © GUILBAUD ENTERPRISES   
Web Site Definition & WebUpdate3 Site Management Coding © Internet Marketing and Design